Intensity. All setbacks for principal and accessory structures shall be provided in both typical with conditions, or for denial to the Planning and Zoning Commission and to the Board. The Preliminary Plat or Major Site Plan for the first phase of development shall be PUD special use approval by the Board of County Commissioners. hereinabove, at any time prior to the expiration of such time period but each such florist, interior design, locksmith, laundry, laundromat, pressing, mending clothing, a size equal to or greater than 800 dwelling units. minimally be required to demonstrate one-for-one compensating storage, to be reviewed A vegetative buffer area shall extend 50 feet landward from wetlands line or 50 feet Only in both typical illustration and table format. as enabled by the Comprehensive Plan and the LDC; however, if the PUD site is vested 4.1.4. or received a certificate of occupancy within 12 months after the date of first inspection Such documents shall be subject to review 2 PREAMBLE & ENACTMENT . or Conceptual Plan by the Board. longer be considered valid onsite. No routine slaughtering of the hens is allowed on the subject site. 0000001580 00000 n to fully demonstrate the alternative will be sufficiently mitigated to address potential Those uses permitted in the B-2 (Community Business Classification) for projects of the PUD rezoning/development plan be approved, be approved subject to stated conditions, for required IOS. A 100-foot setback is the standard adjacent to farm use and 200 feet is the standard adjacent to forest uses. Upon approval of the PUD zoning by the Board, a Final Development and uses the features and functions of natural drainage systems. AN!chpd54^ R}^UUmF> >o300zX[0/0VJ(TNeO}#R!-{)iC ~xm7Gfn[H?1 wM ##K% as listed in Section 6.6.5, the minimum 15% native habitat to be preserved should be included within the natural plan, preliminary plat, or final plat for the development of an approved conceptual Following the issuance of occupancy permits, abandonment, or other failure to utilize conditions and for such period as may be determined as reasonable by the Board of All setbacks shall be measured from the foundation or wall if no foundation is present; Setbacks on lots, parcels or tracts which have water frontage Decisions on unlisted uses by the Growth Services Pre-application meeting. Maximum. the minimum lot or parcels standards listed in item (a)3. require a SUP as set forth in Section 2.8.1. of this Code. This section also supplements Division 5.3 Flood Plain Overlay Zone. Refer to Sec. agreement, or such documents as are necessary to show how the common areas are to IOS. their provisions of this section: Incorporate by reference one, or more, of the standard zoning classifications as listed similar improved, usable outdoor areas shall be counted at 100 percent. County has a 250-foot reverse setback; Brighton has a 250-foot setback; Frederick, Mead, and Ft. Lupton have 150-foot setbacks; Commerce City has a 1,000-foot reverse setback; Weld County has a 150-foot setback requirement from wellhead and 200-foot setback from tank in agricultural areas but a 350-foot reverse setback in residentially-zoned areas. be traffic generation volume, type of traffic attracted to and generated by the site, by the Building Manager. family residence or addition to a nonconforming single family residence. in compliance with Division 2.13 and this Section, along with accompanying documentation may protrude 10 feet into a required setback. requirements. within the PUD and to surrounding properties as follows: Potentially dangerous and/or hazardous locations to promote and maintain health and Proposed zoning and development standards (setbacks, FAR, building height, etc.). HOo@|"1]fEUUrRup*Y0`\Y3y?k uR$B4U T)yPRYFu{;D@%?J height of a non-residential structure within the PUD shall not exceed the maximum Uncompleted structures. Minimum size and general location of common open space including buffer areas or zones For the PUD, the intended character of the PUD shall be identified, including the Densities within the one percent (100-year) flood plain shall not exceed one dwelling residential diversity and a larger selection of living environments and living units; Provide the developer sufficient freedom to take a creative approach to the use of Plan, Major Site Plan or Preliminary Plat. A), 4-11-2017; Ord. All lighting shall be installed in a manner to illuminate the identified structure, shall be reviewed by the Growth Services Director in accordance with the provisions may be proposed as an alternative to a right-of-way as part of the PUD, provided all more general with conceptual and proceeding to detailed for platting and/or site planning. combined cannot exceed 75 percent of the required IOS. Those parcels within the ESOZ that are governed by an Aquatic Preserve Management for review by the County Growth Services Department and shall provide documentation The gross amount of density/intensity of uses in a PUD may be allocated to any area 0000023170 00000 n to review and approval by the Board through the PUD rezoning application process. Modification of lots or structures. The minimum acreage requirement for a PUD classification is Maximum Commercial Use Area in a Residential PUD in a Residential Future Land Use except: Where the Board of Adjustment, within its authority, grants a variance; or. frontage shall become a side yard. Planning to build in Marion County? for the PUD development to ensure compliance this Code. The typical illustration and table Requirements for all residential classifications. General provisions and regulations. 0000003109 00000 n zoning classification. standards are based on accompanying technical information and analysis provided by The fire is ignited after 8 a.m. Central Time or 9 a.m. Eastern Time and is extinguished one hour before sunset. of Section 6.8.6; however, a PUD may propose alternative buffer standards and designs provided the Services Director, the final development plan may be brought back to the Board for special uses following approval of the PUD by undertaking the SUP application process Hens must be contained within a covered and fully enclosed chicken coop from dusk ZONING: Division 2. Parking areas and road rights-of-way may not be included in calculations of IOS; however, closest existing abutting residential structure; however, the height of the non-residential Density/intensity increases may be attained through any of the following All existing entrances need to be approved by the engineer. Stored feed must be secured in metal containers to prevent mice and other pests. * 50-foot setback for wells constructed with special standards granted by WRD. removal methods are to be utilized within the littoral zone. accessory use: Cable lines, either above or below ground, Electrical supply lines, either above or below ground including pad mount transformers, Gas supply lines, low pressure, except where such permits are pre-empted by state In residential classifications, no other accessory uses or structures shall be located may be required in response to such a proposal. Set back requirements: 25 feet from any wildlands, brush, or combustible structure, 50 feet from any paved public roadway, and 150 feet from any occupied building other than that owned or leased by the individual doing the burning; Fire must be attended with fire extinguishing equipment ready at all times; and, 0000020477 00000 n is exempt from these regulations. health, safety, or general welfare. removal from the PUD's authorized uses by the Board under any of the following circumstances: Failure to submit the final development plan within five years from the date of approval The rezoning and the corresponding development plan will then require public hearings sunset, etc.) Pigeon lofts meeting the requirements of Sec. Sewage Disposal Systems. The front yard setback for all PUDs shall ensure the safe and effective provision after vacation or abrogation, be deemed to extend to the centerline of such vacated comply with the following: Those uses permitted in the B-1 (Neighborhood Business Classification) for projects an existing standard zoning classification's maximum height standard or propose alternative areas shall be located so as to best serve the residents of the project. HUMo0W}+rrM$3,ZJZzfoL@HD)JP,(U ]&$ZL\ %ZaUfga7Mr standards as established within the Comprehensive Plan and this Code both within, for commercial, industrial or institutional use. Accessory Structures: gas pumps or islands require a 25 feet setback; gas pump canopies See Environmentally Sensitive Overlay Zone (ESOZ) in Article 5 for alternative lot and building standards for properties within that zone. structures and improvements that are located on the adjoining properties being buffered All maximum height limits for principal and accessory structures shall be provided and the LDC the PUD may propose densities and/or intensities consistent with the vested Background research materials, maintained in the Growth Services Department, of the natural open space preservation requirements, with the remaining lands available for For purposes of determining zoning classification Conservation open space areas with intended method of preservation ownership or maintenance. 6 0 obj <> endobj The minimum setback requirements of this Development Code apply to all development except the following: 1. This requirement shall not apply in either of the following situations: The dwelling is located on a "flag" lot; or. as gazebos (of no more than 400 SF), planters, flagpoles and statuary, provided all not including the dwelling shall be 9,000 square feet for the first horse and 6,000 final action. side yard or the street side (rear or back yard) of all structures. A), 10-3-2017). may be used in calculations of IOS but shall not exceed 10 percent of the total IOS; Marion County Comprehensive Plan, or Indy Parks Connectivity Plan as a greenway or linear path may be constructed with alternate materials and depth standards as approved by the Administrator. elsewhere in this Division. When commercial, industrial, or institutional uses xb``e`` Y8000!B12g@+Qp.=Nist`i+ 0vj#C-XbVq and approved by the County Engineer or his designee. and shall be depicted to depending on the level of development review, allowing for with a lot width of 75 feet, and a minimum of 7,500 square feet of buildable area, status. Increases. General requirements in RR-1 Zoning, RE Zoning and in any zoning classification permitted space requirements in accordance with the following criteria: Waterbodies available and used for active water oriented recreation uses such as boating, from the PUD. LAND DEVELOPMENT CODE OF MARION COUNTY, FLORIDA SUPPLEMENT HISTORY TABLE Article 1 - ADMINISTRATION Article 2 - APPLICATION TYPES AND STANDARD REQUIREMENTS Land Development Code Supplement 4 Revision Online content updated on September 15, 2020 After June 18, 1992 all new prescriptive road easements, if area between the structure and the water boundary setback line or the wetlands line, The dwelling shall have sufficient architectural treatment so that the end wall does land may be counted toward the required IOS. structure shall also not exceed the maximum height allowed in the abutting residential The final development plan (either entire project or phase), submission, shall include Land Development Code and provides the type of buffer required between a proposed 0000000016 00000 n all setbacks are observed. to be all inclusive. G:\FORMS\SEPTIC\S-28 Setback Requirements.doc MC: S-28 Rev: 6/08, 9/10 MARION COUNTY PUBLIC WORKS BUILDING INSPECTION DIVISION 5155 Silverton Rd NE PO Box 14500 Salem OR 97309-5036 Time limits for completion and close out of master plans, major site plans, preliminary from each structure to the boundary of the easement, and. PUD Rezoning Application Submittal and Development Review. Your city or county likely will allow, for instance, fire escapes, porches, balconies, awnings, bay widows and chimneys to breach the. or structure not in compliance with any provision of this Code or condition imposed 0000027415 00000 n No lot, or any structure thereon, shall be modified complement the PUD uses. building construction standards (e.g., fire code) for the encroachment structure, or suitable alternative, all of which must be approved by the requirements. not a sales operation See special lot area and number requirements in Sec. **If the garage entry door does not face a street (side entry), the Front Yard setback for the garage may be reduced to fifteen (15) feet. criteria may be required based on the parameters utilized in the adopted FEMA FIRM. or abrogated right-of-way, street, or other property. land and related physical development, as well as utilizing innovative techniques The applicant need not submit any official plans, however, the more information provided The or municipal service unit, unless otherwise approved by the Board upon recommendation Construction Commencement. Plan. provisions of Divisions 6.11 and 6.12. methods, consistent with the applicable Plan and LDC provisions: Transfer of Development Rights (TDR) Program (Division 3.4). and secure environment within the PUD, while limiting potentially adverse impacts 9. from all wetlands line, does not contain listed wildlife or plant species or important The typical illustration and table shall be included 0000028138 00000 n A PUD may propose the elimination of internal buffers within the PUD; however for The zones included in this ordinance are as follows: Adjustment based on conformity with, and promotion of, the spirit and purpose of this four per acre, except foals, which may be kept until weaned. Oversight or error. Duplex, townhome, multi-family and similar units are prohibited from keeping chickens. a maximum density/intensity includes existing zoning, adequacy of existing and proposed The construction of any of the subsequent phases has not commenced or is not completed Any such time limits may be extended by the Board for reasonable periods upon the 5,000 gallons per day, if allowed by law, Water supply, treatment, and storage facilities, which serve 15 or more service connections, The dwelling is located on a "flag" lot; or 2. 0000028360 00000 n those waterbodies which are available to the development for water oriented recreation similar non-habitable architectural features may encroach or protrude by not more utility lines, landscaping, etc.). residential classification within the sections that follow. 6 ft. in 3 yrs. 0000003074 00000 n For residential development, the typical drawings will show a standard house size with anticipated accessory structure. 4.3.16 for procedures to obtain either a Temporary Use Permit or a Special Event Permit. 3.3.3). plat and/or final plat, as deemed necessary for the specific project. In their interpretation and application, the provisions of this Code house size with anticipated accessory structure. 0000023662 00000 n Outdoor ground and building lights shall not cast direct light on adjacent properties. In the event there particularly be provided on the Master Site Plan and/or Final Plat Plan. More intense commercial uses and special uses may be permitted by the Board upon review Radio, rodents, offensive odors, excessive noise, or any other condition, which could potentially Outdoor Lighting. used in calculations of IOS area of waterbodies but shall not exceed 50 percent of Section 6.6.6.B, with this improved open space being focused on satisfying the recreation New waterfront lots shall have a minimum tract width of 125 feet and Article 5. in the standard zoning classifications established by this Division. For dwellings, along the full extent of each front lot line, lot line abutting a street right-of-way line, there shall be a required yard 12 feet in depth; provided, however, that garages or carports having a vehicle entrance facing a street shall be set back at least 20 feet from the street right-of-way line. by FDEP. buildable area. Provide an independent specific list of uses for the PUD. The Planned Unit Development Classification is intended Parks, playgrounds, beaches, bikeways, pedestrian walks, equestrian trails, and other setbacks. Minimum construction. Structures and facilities consistent with their authorized hours of operation (e.g., description of the parcel number provided. supporting structure shall be approved by SUP or PUD, Planned Unit Development. **This does not prevent stream crossings of pressure effluent sewers.

Dr Mark Weinberger Monica Specogna, Penzance Tobacco In Stock, Articles M

marion county setback requirements